Building my ICF house part 4 : Concrete slab with radiant heat tubing

Building my ICF house part 4 : Concrete slab with radiant heat tubing

Building my ICF house part 9 : Second floor concrete joistПодробнее

Building my ICF house part 9 : Second floor concrete joist

Building my ICF house part 7a - ICF floor deck (aka suspended concrete slab)Подробнее

Building my ICF house part 7a - ICF floor deck (aka suspended concrete slab)

Building my ICF house part 8 - Install Electric ServiceПодробнее

Building my ICF house part 8 - Install Electric Service

Building my ICF house part 7b - suspended concrete deck and ICF floorПодробнее

Building my ICF house part 7b - suspended concrete deck and ICF floor

ICF house build part 4 prepping and pouring the basement floor with radiant heatПодробнее

ICF house build part 4 prepping and pouring the basement floor with radiant heat

How To Build A HouseПодробнее

How To Build A House

Building my ICF house part 3 : Forming and pouring the walkout basement frost wallПодробнее

Building my ICF house part 3 : Forming and pouring the walkout basement frost wall